Multi-purpose battery station IElectrix E.DIS Friedland

EDIS Friedland IElectrix rechts
EDIS Friedland IElectrix links

Project Details

Project: 1.00 MWh concrete station
with smartBattery and integration into the smartEMS virtual power plant
Customer: EDIS – Friedland IElectrix

SCADA Deliveries

WBS750 station control with operating and monitoring platform
with Bachmann M1 and zenon Energy Edition, 8.10
smartBattery Control
Inverter/Batteries IDT/Samsung
HMI Design 1024×768, Touch
Straton, zenon Logic
IEC60870-5 Interfaces -104, -101
Modbus-TCP Interfaces
Interfacing with network operator
Interfacing with virtual power plant
Interfacing with smartEMS using VHPready
Interfacing with Bachmann M1 Controller
Bachmann grid measuring and protection module GSP