Project: 6 MW / 10 MWh Li-Ion Battery Power Plant
Customer: UK Power Networks, Leighton Buzzard, UK
EPC: S&C Electric
Project: 6 MW / 10 MWh Li-Ion Battery Power Plant
Customer: UK Power Networks, Leighton Buzzard, UK
EPC: S&C Electric
Redundant operation
zenon Energy Edition, 7.11
HMI design in FullHD
Interfaces IEC60870-5-104, DNP3
Interfacing with grid provider
Interfacing with archive system
Interfacing with digital I/O (AUX)
Interfacing with Bachmann M1 Controller